Sunday, August 19, 2007

Big catch up note

Okay, I last posted a note on 7 August. Tonight is almost two weeks later--zoinks!

We have been going full throttle to get ready for the final inspections. In the last two weeks we have: installed two full bathrooms, a kitchen, finished all the electrical in but one room, built a glass block wall, installed tile in two bathrooms, plumbed in the water heater, installed the porch railings, the porch stairs, the balcony railings, the window screens (had a lovely 52 degree night on Friday), installed a sub-panel for electric as we have 10 more spaces than our 40 space panel (electrical breakers take one to two spaces each), and I am sure more than that. Whew--just typing it wears me out. We also have two sickies in the house right now--Linnea and number one son have a cough/running nose/ear infection going. Son is getting better but Linnea may take a trip to the base emergency room tonight to get some medicine to help her get better.

Looking over the photos from the last weeks, I see that we also spent the first nights at the house--how could I forget? We took last week off on leave and camped overnight from Tuesday to Saturday. Coming back to the apartment in military housing was a let down after being at Thistle House for five nights. Even in it's chaos, it's an easy to live in house. Plus, all the food is there now and the larder is bare here. There is no connection to the internet at Thistle House yet, and I told the kids we are not moving a single computer until every dust speck is gone and all messy work is done. That motivated them as that means the Xbox stays at the apartment too.

So, here is a montage of photos from the last few weeks; comments are welcome.



Basement mechanical room; well pressure tank, water filter, water heater with pressure relief tank--not pictured are the electrical panels and PEX manifold.



The Leaning Tower of PVC Babel. This puppy took about two hours to figure out and build. I had to label all the parts--three bowl sink, one garbage disposal, two dishwashers and one air admittance valve. When it was installed, the right sink drain line was 1 1/2 inches below where it was supposed to be--two hours later it was right. Works great.



Here's the kitchen sink without the Leaning Tower of PVC Babel. Did I mention that we got this sink (Kohler) from the Habitat for Humanity ReStore? It's a real bargain--we spent $40 on a sink that would have cost us $2,000. All we had to do was clean it up and remove the old fixtures. Sweat equity in action.



Re-installing the KitchenAid fridge doors after moving it upstairs. I am really getting bald.



The essentials are getting in place--and if anyone knows where my green Nalgene water bottle is, I need it for physical training tomorrow morning.




Laundry/bath sink--Kohler fixtures are great--install easily and well. I have one problem with a sink missing a washer and they are FedEx-ing it to us. That's three sink faucets, three showers and one bath faucet. Great stuff--two thumbs up and five stars.



A nice photo taken by son #1 (I think). Shows the laundry/bath and nice use of the mirror. Linnea developed this mirror fetish while we were stationed in England, and we came back with something like 15 wall mirrors. Apparently everyone in England is getting rid of theirs and we had to take them--probably something to do with reparations after the Revolution.



The cat is at the house full time now, although he isn't earning his tuna at this time. He is turning into quite the fly and moth catcher though. Number 2 son isn't too bad at flies either, but he doesn't eat them. There is a standing 10 cent bounty on every fly, payable at the ten fly count in Thistle House.



Here it is; the end of the 'Blue Room'. I have an entire future blog series on the trials and tribulations of having a port-a-potty for a year. It's a joy almost indescribable to have indoor plumbing. Now all we need to do is install the bathroom door.



Same toilet in the laundry/bath, showing the glass block shower wall just getting started.



Dinner interruption on Saturday night. Fresh from the garden, our own veg. Disclaimer: the onion is from the store.



Glass block wall, post dinner. Linnea and son #1 are hard at it, installing it. I was doing electric in the upstairs bedrooms.



We are doing a 'Tuscan' theme in the laundry/bath, and when I say 'we' I mean Linnea and Daughter. I just haul boxes of tile.



Finishing up the glass block--rubbing off the stray mortar.


That's it for now--more later. Probably another week before a good post, as the Air Force (and DoD) has blocked access to Blogspot from Air Force networks. Being a military IT guy, I totally agree in principle but it sure impacts my slack time at lunch doing updates. Oh, well.

Monday, July 16, 2007

Flooring underfoot

Linnea started the flooring Sunday night in the kitchen. We are installing it under the cabinets, so we are installing it across the area the cabinets will be in. We should take a trip to Indiana and the Cabinet Warehouse just across the border next week. Here are some pictures to show off the outdoor lights and the start of the flooring.




Linnea is working diagonally from the South-West corner.



The stack of 3/4" thick pine flooring. Aged about nine months since we got it. Looks good on the floor, even unfinished.



The tile for the whirlpool tub.

Wednesday, May 30, 2007

Insulation, 3-way lights and busted water lines

The water line that broke was on the insulation guys pump, not ours. No tragedy for us except the lost time. They did get the walls done in the boys room, the kids bath and part of our room. Here is a picture to show you the NuWool insulation in the dormer walls.



Apparently it's the same cellulose that gets blown into the ceiling for your attic, but NuWool adds a glue and borate solution to discourage pests and add fire retardence. Here is a picture of the entire wall in the boy's room.



And here is a good tip; the NuWool is blown in with the velocity of a good softball pitch and it fills all voids it hits. It's also not the most specific in where it aims, so cover over your outlets and anything you don't want filled. We used cling wrap from Glad that really sticks well to itself and the plastic boxes.

Sunday, May 20, 2007

Ready?

Tomorrow we are going to call Troy the Inspector (Inspector Troy?--sounds like a mystery) and schedule our Rough Inspection. It has only taken, umm, way too many months to get this far. Once upon a time we planned, on paper even, to be in Thistle House for Christmas. Anyway, we are over budget and past due for this inspection. I finished the last electrical circuits today with the three-way light switches. I hope I wired those right. It makes sense on paper, or actually on a 2x4, but I have NEVER done one before. Anyway, we need to get to bed so we can call the inspector bright and early.

Sunday, April 29, 2007

Snakes in a Trench!


Travis the electrician and I spent most of yesterday installing the feeder cable from our power panel through the Trench of Despair (and clay), into the two-inch PVC conduit that for some reason decreases it's apparent interior size the further you push or pull the electrical feeder wires.

The trench is the one dug last weekend, and when Linnea asked me if we should install the feeder cable into the plastic drain pipe (to protect the cables from rocks), I naively said, "No, lets keep it indoors until we are ready to hook it up. I don't want to get it stolen." Of course, it's aluminum wire, so not as appealing (or annealing) as copper, and having now spent two sweaty hours just getting it into the drain pipe, I have yet another Lesson Learned. So...

The three 0000 (pronounced four-ought) wires are slightly more flexible than a politician at a party convention, but barely. Trying to get them to traverse the plastic drain pipe with it's interior ridges was like trying to feed an anaconda another anaconda. I ended up cutting a slot into most of the pipe and shoving the wires down into it. The trench also was complicated by the several inches of rain that caved in some of the sides (wet clay on top of the pipe makes it even harder) and the major root for the pine trees that we want to keep just North of the porch.

But before all this, Travis and I made trip number 582 to Lowes to buy yet more house crap. It's amazing how many receipts I have from Lowes. After we are done, I will do a little analysis and put up the numbers. I don't think I am too far off on the number of trips made to Lowes though. Once we had everything needed for the electrical panel, we set to work (and by we I mean Travis as I was wrestling with the anacondas like Jim did on Mutual of Omaha's Wild Kingdom). Travis worked hard in the cool basement as I rolled in the mud and clay with the snakes. Of course, he is the one who knows what he is doing, so it's very appropriate that I was out there doing grunt work. We should have it done tomorrow, assuming we ever get the wires through the conduit.

The conduit has two 90 degree elbows (LBs in the vernacular) that have an opening plate to help in threading the wire through. But the interior LB is RIGHT up against a floor joist, so you can't open it completely or reach more than your two pointer fingers in. Let me tell you, you don't want to have 4-ought wire shoved against two fingers where you can't move them or get them out of the way--I speak from experience. We tried a wire fish taped to the wires, but it pulled off. Next was some rope I had laying about--it stayed on but was too thick to make the second 90 degree turn. Tomorrow we are going to put some small gauge wire inside the wire bundle and pull it through that way.