Tuesday, June 05, 2007

Insulation done, drywall underway

Well, the drywall went up a big way this weekend with the first annual Simonalle Drywall Party. We tried to see if drywall floated on soda up to the ceiling. It took more than just refreshments to get it there though--pizza turned out to be the ticket. We got almost all of the downstairs ceiling board up, and lots of the walls too. The weather was hot and humid, and cutting gypsum drywall board with the loose insulation laying around made for a miserable day, but we had good friends helping to offset all of that. We are really looking like a house now, as the kids said over and over.

Here's some pictures to prove it.


This is looking into the kitchen from the living room.


And looking through the stairwell into the living room and kitchen.

Wednesday, May 30, 2007

Insulation, 3-way lights and busted water lines

The water line that broke was on the insulation guys pump, not ours. No tragedy for us except the lost time. They did get the walls done in the boys room, the kids bath and part of our room. Here is a picture to show you the NuWool insulation in the dormer walls.



Apparently it's the same cellulose that gets blown into the ceiling for your attic, but NuWool adds a glue and borate solution to discourage pests and add fire retardence. Here is a picture of the entire wall in the boy's room.



And here is a good tip; the NuWool is blown in with the velocity of a good softball pitch and it fills all voids it hits. It's also not the most specific in where it aims, so cover over your outlets and anything you don't want filled. We used cling wrap from Glad that really sticks well to itself and the plastic boxes.

Tuesday, May 29, 2007

Insulation

It's in the high 80s today, and the poor guys from Robinson Insulation had to install the NuWool in the heat. They started this morning with the blow-in loose cellulose in the attic and boy did it make a mess!



Take a look.



Then they did the leaning walls/roof that the lower slope of the gambrel roof makes. Linnea and the older son installed the upper portion of the drywall after they filled the lower part. We left the top sheet off to allow them access to fill the voids, but it wasn't needed. It has enough velocity that it blows everywhere and as a result the house now looks like this upstairs:




Tomorrow they will be back at it, doing the gable walls upstairs and exterior and fire-blocking walls downstairs. I am kinda glad that I am back at work for most of this week.